MassDOT Complete Streets Funding Program
Westwood, Massachusetts

Since 2016, TEC, Inc. has supported the Town of Westwood with both development and implementation of its Complete Streets Program. With our assistance, the Town secured Complete Streets funding for FY 2017 and FY 2018.

We teamed with MassDOT and the Town of Westwood to plan and design 1,500 feet of pedestrian safety improvements along Route 109 (High Street) and Pond Street. The project included installing and reconstructing sidewalk, drainage improvements, ADA/AAB-accessible curb ramps, and landscape design. Additional improvements included:

  • Realignment of Pond Street at its intersection with Route 109 (High Street);

  • Installation of a pedestrian refuge island to improve pedestrian safety; and

  • Exclusive turn lanes along the Route 109 (High Street) approaches.

Construction was completed in Spring of 2017.​