TEC teamed with MassDOT and the Town of Bedford to plan and design 1,980 feet of pedestrian and bicycle safety improvements along Routes 4/62/225 (The Great Road) and Mudge Way. The updated streetscape encourages children to safely walk and bike to the John Glenn Middle School. The design included a new traffic signal to improve pedestrian crossing opportunities, sidewalks, bike lanes, and ADA/AAB accessible curb ramps. Our team also redesigned a multi-use path extending across the property to Bedford High School, providing multi-modal access for high school students.


The multi-use path’s location to nearby historic areas and wetlands posed unique permitting challenges that our team was able to overcome. Construction was completed in the Fall of 2017.

  • Preliminary assessment
  • Survey
  • ROW
  • Traffic signal design
  • Highway design
  • Drainage design
  • Pavement design
  • Sidewalk & streetscape design
  • Traffic management plans
  • Utility coordination
  • Lighting
  • Landscaping
  • Construction-phase services