Happy Hollow Access Road

TEC provided design, bidding, and construction-phase services as part of an on-call contract for the installation of a new 1,500-ft access road and water main to a new water treatment facility. TEC provided an existing conditions survey and designed the road, which incorporated the design of a 12-inch water main. During construction, the firm attended meetings and coordinated with the town, designer, and contractor; reviewed shop drawings; responded to RFIs; performed site inspections; generated daily reports; and reviewed contractor pay applications. Additionally, TEC also provided construction layout/field survey on behalf of the contractor.
Wayland, MA
Services
  • Roadway design
  • Drainage design
  • 3D modeling
  • Cost estimating
  • Construction layout/field survey
  • Construction-phase services