Andover Medical Center

Andover, MA
Services
  • Retaining Walls
  • Construction Phase Services
  • Quality Control & Assurance 
  • Shop Drawing Review
  • Quality Assurance Inspections
TEC successfully provided construction monitoring services for the Andover Medical Center facility at 323 Lowell Street (Route 133). The facility consists of two towers, totaling 60,000 square feet. Tower I permitting began in 2012 with a 30,000-square foot medical office, parking, utilities, and a new stormwater management system. 


In building on the success of Tower I, our team provided structural design services for the Tower II expansion, which also included a three-story structure with a full basement that was completed in 2017. The structural design for both buildings included site retaining walls, steel moment frames, concrete foundation walls, concrete strip and spread footings, and concrete slabs. We worked closely with our client and the project architect to ensure development would meet the needs of the prospective tenants. We were also responsible for construction phase services including shop drawing review and construction inspections.

© 2019 TEC, Inc.

Twitter icon TEC Blue square.jpg
youtube logo TEC blue square.png